Structured Grid Architecture#
This page documents the FloPy StructuredGrid path used by the
MODFLOW-family solvers: static object model, build sequence, and the
bridge to Field / FieldParam for solver-ready arrays.
Code map#
hydromodpy/spatial/mesh/cartesian_grid/sgrid_config.py: validated grid config contract.hydromodpy/spatial/mesh/cartesian_grid/sgrid_from_config.py: public build entry point.hydromodpy/spatial/mesh/cartesian_grid/sgrid_generation.py:StructuredGridBuilderand geometric assembly.hydromodpy/spatial/mesh/cartesian_grid/utils/raster_grid_reader.py: top-surface raster loading.hydromodpy/spatial/mesh/cartesian_grid/utils/planar_discretizer.py: planar discretization helpers.hydromodpy/spatial/mesh/cartesian_grid/sgrid_mesh_adapter.py: geometry bridge from solver grid to field-side mesh logic.hydromodpy/spatial/mesh/cartesian_grid/sgrid_field_discretization.py: field discretization helpers.hydromodpy/spatial/mesh/cartesian_grid/sgrid_fieldparam_discretization.py: heterogeneous parameter mapping to solver arrays.hydromodpy/solver/modflow_grid/solver_mesh.py: solver-side consumer of the resolved mesh contract.hydromodpy/spatial/field/core/field_param.py: upstream field parameter contract.
Recommended reading path:
sgrid_config.pyandsgrid_from_config.pyraster_grid_reader.pyandplanar_discretizer.pysgrid_generation.pysgrid_mesh_adapter.pysgrid_field_discretization.pyandsgrid_fieldparam_discretization.py
Static class diagram#
The static object model around FloPy StructuredGrid: HydroModPy
domain objects that feed the builder, the narrow responsibility of
StructuredGridBuilder, the boundary between HydroModPy classes
and the external FloPy grid, and the downstream adapters that read
StructuredGrid geometry.
Reading guide:
-->means a stable relation or a produced object...>means a transient usage or read dependency.
Notes:
StructuredGriditself belongs to FloPy. The diagram focuses on the HydroModPy classes that prepare or consume it.SGridConfig,RasterGridReader, andPlanarDiscretizerare not shown here on purpose; they belong to the build sequence below.
Build sequence#
The dynamic workflow that turns one user-facing SGrid config payload
into one FloPy StructuredGrid: validation and normalisation of
SGridConfig, top-surface loading and planar discretisation, the
branches that resolve the bottom surface, and the final handoff to
StructuredGridBuilder.
Reading guide:
->means a call.-->means a returned value.altblocks show the mutually exclusive bottom-surface strategies driven bycfg.genmtd_bot.
Notes:
build_sgrid_from_config(...)owns config resolution and surface preparation.StructuredGridBuilderstays narrower: it validates top/bottom geometric consistency, computes vertical layering, and instantiates the FloPy grid.
SGrid / FieldParam discretization#
How HydroModPy bridges FloPy StructuredGrid (solver side), planar
field meshes (field/geology side), and Field / FieldParam
value mapping for solver-ready arrays.
Class view:
Activity view:
See also#
Catchment-Mesh Architecture for the unstructured / Gmsh catchment-mesh path.
Field Architecture for the field-side abstractions consumed here.
Spatial Support UML Diagrams for the parameter support layer above.
Mesh Architecture Pivot for the cross-mesh pivot format.
MODFLOW-NWT Contracts for the DIS / BAS contract that consumes the structured grid.